Skip to main content
CNC.wiki
Back to wizard
M
mitsubishimds-e-(drive)

51ALARM 51 — OVERLOAD 2

1
2
3
4
5
6
Step 1 / 6
Turn the main power OFF and verify that the PN voltage is correctly supplied to the drive unit. If the CHARGE lamp is dark or the L+ / L- terminal screws are loose, securely tighten the screws or increase the facility power supply capacity.